Division of Water Treatment

Chuck Campbell
Commissioner of Plant Operations

Collins Park Water Treatment
Andrew McClure, Plant Administrator
3040 York Street
Toledo, Ohio 43605
Phone: 419-936-3021
Fax: 419-936-3053

 

The Division of Water Treatment is responsible for the effective production, filtration, and quality control of water for the City of Toledo. The Division's responsibility starts at the source of raw water, Lake Erie, and extends throughout the treatment process. This Division operates and maintains the largest softening plant on Lake Erie. Filtering an average of 80 million gallons of water per day is a monumental task. At no time in the process is the water allowed to stop moving. Every area within the plant can be isolated, so maintenance or repairs can be made without affecting the flow or quality of the water produced. The Toledo Water Treatment Plant is known not only for quantity and quality of water produced, but also for its staff's dedication to implementing improvements in both testing and treatment of water. It is for these reasons that many suburban communities purchase water from Toledo, and why many businesses choose to locate in the Toledo area. 

 

Strategic Objectives

  1. Produce the best quality potable drinking water at the lowest cost for 500,000 people in the greater Toledo Metropolitan area by purifying and transporting treated surface water to sustain industry and enhance the lives of our residents.
  2. Meet or exceed each and every regulatory requirement for providing drinking water to the residents.
  3. Provide 24/7/365 uninterrupted supply of potable water 100% of the time each and every day.
  4. Continue implemention of the Water Treatment Plant's Capital Improvements Program, concentrating on site-specific actions required by Ohio EPA to maintain and enhance our ability to serve Toledo and the surrounding population and industries with Superior Award-Winning Water.
  5. Maintain the apprenticeship program for the skilled trade positions and the shadowing program for the administrative positions.
  6. Encourage participation in operator training and assist with departmental license incentive program.

 

Collins Park Water Treatment Plant

Control RoomProfessionals at the Collins Park Water Treatment Plant see that consumers are provided with crystal clear water of the highest quality. Testing of the water is performed 24 hours per day 365 days per year. This testing gives our operational personnel timely information, so that adjustments can be made to the treatment process to ensure constant water quality is met. 

The plant has a quality control laboratory in which hourly analysis is performed on raw and treated water. The information from the Senior Chemist’s analysis is communicated to the Senior Control Room Operators who make appropriate chemical adjustments required for the proper treatment of the water. The amount of chemicals used in water treatment is comparatively small, so small in fact that the total amount of chemicals needed to properly treat 100 gallons of water would amount to about one teaspoonful, or 15 parts of chemical to one million parts of water. The process of filtering the water is monitored and tested continuously by a highly trained staff of professionals. Monitoring, like the production process, is also a 24 hour a day job.   

The Collins Park Water Treatment Plant employs Engineers, Chemists, LicensLake Depth Samplinged Water Operators, Electricians, Plumbers, Machinists, Laborers, Custodial Workers, Clerks and Administrators.

Following events of September 11, 2001 plant security was increased to the degree that we no longer provide tours for the public.

Water Quality Assurance

The Water Quality Laboratories are responsible for the collection and analysis of samples, which will ensure that the water being distributed meets or exceeds the criteria of the Safe Drinking Water Act. Compliance reports are sent to the Ohio Environmental Protection Agency monthly with the analytical results for regulated contaminants. This is accomplished by the annual collection and analysis of more than 5,000 water samples from the water plant and over 2,500 samples from the distribution network. The consistent high quality of water is of utmost importance to the Water Treatment Plant. That is why over 50,000 tests are performed annually from the water samples taken at the raw water source, through the production and treatment process, distribution network and from consumer taps.

Laboratory Section

Within the Laboratory section is the Microbiology, Water Quality and Research Laboratories. The three laboQualityratories are certified by the Ohio Environmental Protection Agency. The Water Treatment Plant ensures that the water is safe and palatable by the means of a very aggressive sampling Researchprogram. The collection of the water samples is the responsibility of the Laboratory section. Each sample must be correctly drawn, documented, labeled, and delivered to the Laboratory in a timely manner. The proper monitoring of water quality requires individuals that are well trained in a number of technical and environmental fields. This section employs chemists, microbiologists, and sample collectors.