Inspections for underground fire service mains ensure proper installation, safety, and compliance with the City of Toledo standards and NFPA/Building Code requirements. Inspections are performed in three phases:

  • Visual
  • Hydro
  • Flush

What it allows you to do:

  • Install and test underground fire service mains
  • Verify all piping, valves, and hydrants are properly installed, restrained, and functioning
  • Submit required documentation for final installation approval

Apply

  • Applicant must be an Ohio licensed Fire Protection Company Class A contractor registered with the City of Toledo
  • Prepare all approved plans, manufacturer instructions, and product information

Fees

Fees for inspection may vary depending on project scope.

Inspection Phases

Visual Inspection

  • Check site utility plans and work
  • Cover or plug open pipe ends, valves, hydrants, and fittings
  • Restrain piping at joints and changes in direction
  • Minimum 60" cover for all piping and ductile pipe must be wrapped with 8 mil polyehtylene
  • Backfill must be free of ash, cinder, refuse, organic or corrosive material, rocks, or frozen earth

Hydro Test Inspection

  • Ensures no closed valves exist between gauge and test section
  • Test piping at 200 psi or 50 psi above working pressure for at least 2 hours
  • Measure pressure loss via gauge drop or visual leakage and measure any additional water added
  • Fully operae all hydrants and control valves under system pressure

Flush Inspection

  • Follows NFPA-approved flushing procedures accodring to pipe size
Pipe SizeMinimum FlowHose Lines
4"390 GPM1 x 2.5"
6"880 GPM2 x 2.5"
8"1560 GPM3 x 3.5"