What it allows you to do:
- Install a second water meter for irrigation or other approved non-sewer uses
- Measure water separately from your primary water service
- Reduce sewer volume charge on monthly bill
Example projects:
- Commercial irrigation systems
- Golf courses
- Residential sprinkler systems
- Cooling towers
- Industrial processes that re-use water
Before You Apply
Applicants are responsible for ensuring the proposed installation meets all City requirements. A licensed plumber will:
- Determine the location of the proposed meter
- Prepare any required plans or installation details
- Verify the proposed use qualifies for an alternate meter
Questions? Call 419-392-2032
Apply
- Applicant must be the property owner, developer, or authorized agent
- Complete the Alternate or Irrigation Meter Permit application online
What You'll Need
Most applications require:
- Completed Alternate or Irrigation Meter Permit application
- Property address and water account information
- Description of proposed use
- Plumbing plans (for commercial or industrial properties)
Installation Requirements
Alternate meter installations must meet City of Toledo water distribution standards.
Before installation, verify that your design includes:
- A City-approved meter configuration
- An approved locking inlet ball valve
- An approved backflow prevention assembly
- A full-port brass outlet ball valve
- Proper meter spacing and pipe clearances
- Installation by a qualified plumber or contractor
Technical Specifications
Alternate Meter Installation Diagram
Irrigation Meter Installation Diagram
Approved Locking Ball Valve Specifications
Approved Outlet Ball Valve Specifications
Backflow Prevention Compliance
Commercial or industrial properties need:
- 1013 reduced pressure zone type backflow device
- Tested and registered with HydroSoft
- Annual testing reported to HydroSoft
Residential properties need:
- 1020 pressure vacuum breaker type backflow device
Fees
Permit: $240
Commercial or industrial annual inspection: $150
Review Process and Timeline
The Alternate or Irrigation Meter Permit application is reviewed by City Staff.
Schedule Inspection
Once the meter setting has been installed by a licensed plumber, the plumber or property owner can schedule an inspection.
- 8 a.m. to 5 p.m.
- 419-392-2032
Schedule Meter Installation and Update Account
Once the meter setting is approved, you can schedule a time to have your new meter installed by city staff.
- 7 a.m. to 5:30 p.m.
- 419-245-1800