An Alternate Meter Permit allows the installation of a second water meter that measures water not discharged to the sanitary sewer system.

Alternate meters are commonly used for commercial properties, but may also be installed at residential properties for dedicated irrigation systems.

What it allows you to do:

  • Install a second water meter for irrigation or other approved non-sewer uses
  • Measure water separately from your primary water service
  • Reduce sewer volume charge on monthly bill

Example projects:

  • Commercial irrigation systems
  • Golf courses
  • Residential sprinkler systems

Before You Apply

Applicants are responsible for ensuring the proposed installation meets all City requirements.

  • Determine the location of the proposed meter
  • Prepare any required plans or installation details
  • Verify the proposed use qualifies for an alternate meter

Apply

  • Applicant must be the property owner, developer, or authorized agent
  • Complete the Alternate Metering Permit application online

Click here to Apply

What You'll Need

Most applications require:

  • Completed Alternate Meter Permit application
  • Property address and water account information
  • Description of proposed use
  • Meter location or site sketch
  • Plumbing plans

Installation Requirements

Alternate meter installations must meet City of Toled water distribution standards.

Before installation, verify that your desidn includes:

  • A City-approved meter configuration
  • An approved locking inlet ball valve
  • An approved backflow prevention assembly
  • A full-port brass outlet ball valve
  • Proper meter spacing and pipe clearances
  • Installation by a qualified plumber or contractor

Technical Specifications


Fees

$240

Review Process and Timeline

The Alternate Meter Permit application is reviewed by City Staff.

Schedule Inspection

Once the meter setting has been installed by a licensed plumber, the plumber or property owner can schedule an inspection.

  • 8 a.m. to 5 p.m.
  • 419-392-2032

Schedule Meter Installation and Set Up Account

Once the meter setting is approved, you can schedule a time to have your new meter installed by city staff.

  • 7 a.m. to 5:30 p.m.
  • 419-245-1800