Construction Begins Spring 2026
The City has contracted with Kokosing to complete the water tower construction. Crews will begin construction in spring 2026.
The City of Toledo plans to construct a new water tower at Schneider Soccer Complex beginning in 2026. This project is part of a broader effort to improve water pressure, increasy system reliability, and transition the city's water distribution into two pressure zones.
Location
The water tower will be located near the Detroit Ave. entrance to Schneider Soccer Complex, positioned between the soccer fields and the Kroger entrance.
This location was selected because:
- it is near a 30 in. watermain
- coordination with existing park infrastructure and planning
This location also creates an opportunity for the towers to serve as a recognizable landmark within a well-used community space.
Tower Design
The project includes one elevated water storage tank.
- Capacity: 2 million gallons
- Height: approximately 160 feet
- Diameter: approximately 56 feet
Construction and Park Access
Construction is expected to take place between 2026 and 2028.
Important things to know:
- park will remain open whenever possible
- there will be periods of construction noise
Construction hours are typically 7 a.m. to 5 p.m. The City and contractors will work to minimize ipacts to the surrounding area as much as possible.
Did you miss the meeting on October 16, 2024?
What it will look like
This is the view from Detroit Avenue. The water tower will be behind a fence at the edge of the soccer complex property.
Sign Up for Email Updates