Project Overview
The City of Toledo re-aligned Canton Street to intersect with Cherry Street at a 90 degree angle at Utica in 2026. North Street no longer connects to Canton. The City upgraded signals and striping to increase driver and pedestrian safety.
Note: a pedestrian hybrid beacon will be added at Canton and Cherry

Stay Informed
Funding
The funding for this project is combined with the funding for the Douglas and Monroe intersection. The total cost for both this reconstruction and the Douglas and Monroe resurfacing project is $2.4 million.
These projects are supported by the state of Ohio.
- $2.15 million state grant
- $250 thousand City of Toledo
$2.4
million
Project Outcomes
- Increased pedestrian safety
- Increased driver safety